Salazar Industries
Home » USACE Safety Staffing | EM 385-1-1 | Salazar Industries

USACE EM 385-1-1 Safety Staffing

Site Safety and Health Officers and safety professionals for Corps of Engineers-administered construction — military construction, civil works, dredging and marine, environmental restoration and VA work run through USACE Districts. Screened against EM 385-1-1 and UFGS 01 35 26, presented within 48 hours, and supported through APP acceptance and ENG Form 6282 designation.

48hr
CANDIDATE PRESENTATION
EM 385
2024 EDITION
UFGS
01 35 26 SCREENED
50
U.S. STATES
Level 1 / 2 / 3 SSHOsAPP & AHA AuthorshipThree-Phase ControlENG 3394 & 6282Dredging & Marine ScopesCAC & Clearance Coordination

Staffing a Corps contract? Start with the spec.

Send us the safety section of your solicitation. We confirm the EM 385-1-1 edition, the SSHO level the residual risk code requires, and the contract-specific additions, then present candidates that fit.

Candidates within 48 hours. APP and AHA authorship quoted separately when you need it.

EM 385-1-1 on USACE Contracts — the Baseline and the Contract

EM 385-1-1, Safety and Occupational Health Requirements, is the U.S. Army Corps of Engineers (USACE) manual that FAR 52.236-13 (Accident Prevention) makes part of every USACE construction contract. The 15 March 2024 edition superseded the 30 November 2014 edition, titled the Safety and Health Requirements Manual. The manual itself says the edition in effect on the solicitation date applies, and existing contracts finish under the edition they started with. The 2024 edition reorganized the contractor requirements into Chapter 2, replaced the old “GDA” language with the Contracting Officer and COR, made ENG Form 6282 (SSHO designation) and ENG Form 6293 (APP worksheet) mandatory, and changed the SSHO qualification criteria.

The manual is the floor. UFGS 01 35 26, Governmental Safety Requirements (May 2024 version, updated August 2026), is where the District and the spec writer set the contract details. They set the SSHO level by residual risk assessment code, require an Alternate SSHO, and decide whether the SSHO may also serve as QC manager or superintendent. They can add the 40-hour EM 385-1-1 course used by some NAVFAC commands, and they set the Accident Prevention Plan (APP) submission window (15 calendar days before work starts). We read both before we search.

Owner Patrick Salazar has worked crane, rigging and site-safety scopes since 2005 — NCCCO Mobile Crane Operator (LBC, TLL and TSS), Tower Crane Operator, Crane Inspector and Lift Director; OSHA 500 construction outreach trainer; First Aid/CPR. He has supported USACE contractors as a subcontractor and screens every Corps placement against the manual and the contract spec.

Who Qualifies: SSHO Levels Under the 2024 Manual

  • Level 1 (full-time) — OSHA 30-hour construction or general industry training, 24 hours of documented safety and health training within the past five years (then 24 hours every three years during the contract), and at least five years of cumulative safety experience within the last ten on projects of similar type, size and complexity — three years with a safety-related degree or an ANSI/NCCA-accredited safety certification such as CSP or CHST. Required on projects with a high or extremely high residual RAC, present whenever work is performed, and not permitted to supervise non-safety personnel.
  • Level 2 (collateral duty) — same training; three years of cumulative similar experience (two with a degree or accredited certification); not permitted on high or extremely high RAC projects.
  • Level 3 (task-specific) — a designated Competent or Qualified Person with the experience to identify hazards and controls for the work performed.
  • Alternate SSHO — meets the contract-required level; covers absences longer than 24 hours (absences up to 24 hours may be covered by an interim SSHO of any level on site).
  • Dredging and marine — UFGS requires a Level 1 SSHO on the primary shift with three years of dredging, marine, construction or safety experience.

The Contracting Officer, in coordination with the local safety office, may adjust training and experience requirements in the contract, and always makes the final acceptance. Our screen reproduces that review so the ENG 6282 package is accepted the first time.

Documents We Support: APP, AHA, Three-Phase, ENG 3394

  • Accident Prevention Plan — developed by a Competent Person on the ENG Form 6293 worksheet, approved by the prime’s corporate safety official, submitted before work starts (15 calendar days under UFGS 01 35 26) and kept current by the SSHO. Authorship and updates are quoted as fixed-fee deliverables.
  • Activity Hazard Analyses — one per definable feature of work (ENG Form 6206), signed by the SSHO, superintendent, QC manager and the subcontractor foreman, with the Competent and Qualified Persons named in writing and a signature log for the crews.
  • Three-phase control — preparatory and initial-phase meetings and follow-up inspections documented for each definable feature, integrated with QC.
  • Inspections and records — daily documented SSHO and QC inspections with a deficiency tracking log, weekly safety meetings and monthly supervisor meetings with minutes, orientation and training records, and AHAs kept on site.
  • ENG Form 3394 — accident and near-miss reporting: notification within 8 hours for fatalities, in-patient hospitalizations, amputations, eye loss or property damage over $600,000; 24 hours for everything else; completed form within 7 days.

How We Screen for Corps Work

  • Edition and spec first — which EM 385-1-1 edition the contract cites, the RAC-driven SSHO level, separation-of-duties rules, alternate requirements and any 40-hour course language.
  • Experience reconstructed — cumulative safety years within the last ten on similar work, confirmed with references from the projects on the résumé.
  • Training with dates — OSHA 30, the 24-hour documented training within five years, First Aid/CPR, HAZWOPER or explosives training where the scope needs it.
  • Credentials verified with the issuing body — BCSP registry, OSHA card verification, NCCCO verification for crane and rigging scopes.
  • District familiarity — which Districts and QA representatives the candidate has worked with, and whether they have written or maintained an APP.
  • Access — CAC eligibility, installation badging history and, for cleared scopes, prior clearance status, verified per candidate and sponsored through the prime.

Timeline on a USACE Placement

  • Same business day — scoping. You talk to Patrick Salazar, not a call center. We capture the contract’s safety spec, the site, the schedule, the start date, badging and access requirements, and who accepts the SSHO on your side.
  • Within 48 hours — candidates presented. Résumés with credential summaries, verified dates, and references, matched to the spec. For urgent needs we present whoever on the bench is genuinely available, and say so if the fit is partial.
  • Your approval — on your schedule. You interview and choose. Nobody is mobilized until you approve a named person and the written agreement and rates are signed.
  • Mobilization — after approval. Local professionals can often start within days. Traveling professionals typically mobilize within about a week of approval; travel, lodging, badging, drug screening and site orientation set the real date. Federal and cleared work adds the government’s own acceptance steps (see below).
  • Certificate of insurance — at contract execution. Issued before mobilization, with additional-insured, waiver-of-subrogation and primary/non-contributory wording where your contract requires it.

After approval: the ENG Form 6282 designation and, where applicable, the APP go to the Contracting Officer or COR for acceptance; work cannot start until they are accepted. CAC issuance and installation access run in parallel. For a fresh award that still needs an APP, budget the APP authorship window ahead of the start date — we can write it while the candidate search runs.

What Drives Cost on Corps Contracts

We do not publish a rate sheet, because the same title can price very differently from one contract to the next. Every engagement is quoted in writing after the scoping call, and the quote states the hourly rate, any weekly minimum, how overtime is treated, per diem and mobilization terms, and how long the quote is valid. What moves the number:

  • Credential level the spec requires — a contract that calls for a CSP or a certified SSHO with federal history prices above a role that OSHA 30 and field experience can fill.
  • Schedule — hours per week, shifts, weekend pours or outages, and whether overtime is worked. Overtime is billed only if it is worked and only as the quote states.
  • Duration — short bridge coverage, a defined project, or a multi-month program with option periods.
  • Location and travel — local professionals carry no travel cost; traveling professionals add GSA-basis per diem, lodging and a mobilization/demobilization charge, which the quote itemizes.
  • Site-access requirements — badging, background checks, drug screening, medical clearances and site-specific training add lead time and, sometimes, cost.
  • Documentation deliverables — APP authorship, AHA libraries and reporting support are quoted separately so the hourly rate reflects the person, not the paperwork.

The rate includes the professional’s pay and payroll burden, workers’ compensation, general liability, professional liability and umbrella coverage, credential verification and our management of the engagement. Nothing is added after the fact that is not in the quote.

Support Through Option Periods and Turnover

  • One point of contact. The owner who scoped the engagement stays on it. Extensions, headcount changes, shift changes and paperwork go through one person.
  • Check-ins. We check in with you and with the SSHO during the first week and at regular intervals afterward, and we ask for the honest version.
  • Replacement support. If a placement is not the right fit, tell us. We work with you on a replacement; the specific replacement and notice terms are stated in your written agreement.
  • Coverage for absences. Planned leave and sick days are coordinated in advance so the site is not left without the coverage your contract requires.
  • Documentation and billing. Timesheets are approved by your designee before invoicing; invoices follow the quote line by line.

Corps contracts run long and change hands. When a designated SSHO leaves, we present replacement candidates within 48 hours, coordinate interim coverage of the required level, and prepare the new ENG Form 6282 for the KO/COR so the designation gap is as short as the contract allows.

Salazar Industries is fully insured: general liability, professional liability, umbrella, workers’ compensation and commercial auto coverage, with COIs on request. Certificates naming your organization as additional insured, with waiver of subrogation and primary/non-contributory wording where your contract requires them, are issued at contract execution. We are registered in SAM.gov as a small business (UEI and CAGE code on request) and can be set up in ISN, Avetta, Veriforce or your own vendor portal on request.

Project Types and Districts

We place safety professionals with contractors working on USACE-administered projects nationwide: military construction on Army and Air Force installations, civil works (navigation locks, dams, levees, flood-risk management, hydropower), dredging and marine construction, environmental restoration (FUSRAP, IRP and MMRP with HAZWOPER and explosives-safety overlays), FEMA-mission-assignment reconstruction, and VA medical center projects administered through Districts. District-specific experience is matched per candidate and documented in the proposal package — ask about your District when you call.

Related: SSHO staffing services, EM 385-1-1 requirements guide, DoD and military safety staffing, VA hospital construction.

Frequently Asked Questions

What is EM 385-1-1 and which edition applies?
EM 385-1-1 is the Corps of Engineers’ Safety and Occupational Health Requirements manual, incorporated into USACE construction contracts through FAR 52.236-13. The current edition is dated 15 March 2024 and applies to contracts solicited on or after that date; earlier solicitations remain under the 30 November 2014 edition until completion.

Do all USACE projects require a full-time SSHO?
The 2024 manual requires at least one Level 1 SSHO at each project site, present whenever work is performed, with exceptions the Contracting Officer may write into the contract for limited-scope, walk-over, sampling, dredging, maintenance and service work. UFGS 01 35 26 sets the level by residual risk assessment code, and high or extremely high RAC work requires Level 1.

How quickly can you provide an SSHO for a USACE project?
Candidates are presented within 48 hours of a scoped request. Mobilization follows your approval, the Contracting Officer or COR’s acceptance of the ENG Form 6282 designation, and CAC or installation badging. Emergency replacement requests are scoped the same day.

Can you write our Accident Prevention Plan?
Yes, as a separately quoted fixed-fee deliverable. The APP is developed by a Competent Person on the ENG Form 6293 worksheet, approved by your corporate safety official, and submitted before work starts (15 calendar days under UFGS 01 35 26). We also develop and review Activity Hazard Analyses.

Are your SSHOs “certified” to EM 385?
There is no USACE SSHO certification. We screen candidates against the manual’s training and experience criteria and your contract’s Section 01 35 26, verify credentials with the issuing bodies, and prepare the ENG Form 6282 designation for the Contracting Officer’s acceptance.

Do you cover every USACE District?
We staff USACE work nationwide and match District-specific experience per candidate. Tell us the District and the QA representative’s expectations and we will document the candidate’s relevant history in the proposal.

Do you support subcontractors as well as primes?
Yes. Subcontractors on USACE projects sometimes need their own safety coverage under the prime’s APP; we staff both.

What does USACE safety staffing cost?
Rates depend on the SSHO level and certification the spec requires, the schedule and overtime, the duration and option periods, the location and travel, and site-access requirements. Every engagement is quoted in writing after a scoping call, with document deliverables quoted separately.

Ready to staff EM 385-1-1 safety on your USACE contract?

Candidates screened to the manual and your spec, presented within 48 hours, with APP, AHA and ENG Form 6282 support.

☏ Call (252) 229-5238 Free Quote
Scroll to Top
309 N William St, Goldsboro, NC 27530  |  (252) 229-5238  |