Salazar Industries
Home » SSHO Staffing Services | Salazar Industries

SSHO Staffing Services

Site Safety and Health Officers for USACE, NAVFAC, AFCEC, VA and other federal construction — screened against EM 385-1-1 (15 March 2024 edition) and your contract’s Section 01 35 26, presented within 48 hours of a scoped request, and supported through ENG Form 6282 designation and mobilization.

48hr
CANDIDATE PRESENTATION
EM 385
2024 EDITION
ENG 6282
DESIGNATION SUPPORT
50
U.S. STATES
Level 1, 2 & 3 SSHOsAlternate SSHO CoverageAPP & AHA SupportENG 3394 ReportingCAC & Clearance CoordinationFederal Submittal Package

Need an SSHO your Contracting Officer will accept?

Tell us the agency, the District or command, the contract’s safety section and the start date. We screen candidates against the manual and the spec, build the submittal package, and stay on the engagement through designation and mobilization.

Candidates presented within 48 hours of a scoped request. Mobilization follows your approval and the government’s acceptance of the ENG Form 6282 designation.

What an SSHO Is — and What the Manual Actually Requires

The Site Safety and Health Officer is the contractor employee responsible for overseeing and implementing the prime contractor’s safety and occupational health program on a project governed by USACE’s EM 385-1-1, Safety and Occupational Health Requirements. The current edition is dated 15 March 2024. Contractors work to the edition in effect on the date of solicitation, and existing contracts keep the 30 November 2014 edition until completion (preamble, para 5.b(1)), so the first thing we confirm is which edition your contract cites.

EM 385-1-1 is the U.S. Army Corps of Engineers safety manual, titled the Safety and Health Requirements Manual before 2024. On a federal construction project that invokes it, the manual sets what the SSHO must have for safety training and experience.

Under the 2024 manual (Chapter 2, paragraph 2-3.b) a Level 1 SSHO — the full-time position most construction contracts require — must hold OSHA 30-hour construction or general industry training, 24 hours of documented safety and health training within the past five years (then 24 hours every three years during the contract), and at least five years of cumulative safety experience within the last ten on projects of similar type, size and complexity — three years with a safety-related degree or a nationally accredited safety certification that takes at least three years of experience to earn, such as the CSP or CHST. A Level 2 (collateral-duty) SSHO needs three years of similar experience (two with a degree or an accredited certification that takes at least two years to earn) and cannot be used on projects with a high or extremely high residual risk assessment code; a Level 3 SSHO is a designated Competent or Qualified Person with the experience to identify hazards and control them for the work. An Alternate SSHO meets the contract-required level without being the primary, and an alternate Level 1 covers the site when the Level 1 SSHO is away for more than 24 hours. The Level 1 vs. Level 2 table below lines the requirements up with their paragraphs.

Two things the manual does not require, even though many websites say otherwise: a 40-hour “EM 385 course” or a BCSP credential. Those are contract-specific additions — NAVFAC’s Pacific, Hawaii and Marianas specifications call for a 40-hour EM 385-1-1 awareness course, and the VA’s own Section 01 35 26 requires a professional safety certification — so the solicitation always governs. The refresher changed too: the 2014 edition required 8 hours of documented training every year; the 2024 edition replaced it with 24 hours every three years. There is also no such thing as an “SSHO certification”: every SSHO is designated on ENG Form 6282, signed by the contractor’s corporate safety official and the SSHO, and accepted by the Contracting Officer or COR before work begins.

Owner Patrick Salazar has worked crane, rigging and site-safety scopes since 2005 — NCCCO Mobile Crane Operator (LBC, TLL and TSS), Tower Crane Operator, Crane Inspector and Lift Director; OSHA 500 construction outreach trainer; First Aid/CPR. He has supported USACE contractors as a subcontractor and reviews every federal placement against the manual and the contract spec before a résumé goes out.

SSHO Level 1 vs. Level 2: The EM 385-1-1 Qualification Table

Paragraph 2-3.b of the 2024 manual sets the minimums. Here they are side by side, with the paragraph behind each line so you can check it against the edition your contract cites.

RequirementLevel 1 SSHOLevel 2 SSHO
RoleFull-time safety and occupational health responsibility (2-2.x(1)). The default is at least one Level 1 at each project site, at the site whenever work is performed (2-8.b(2)).Collateral-duty safety and occupational health responsibility (2-2.x(2)).
Initial trainingOSHA 30-hour, construction or general industry, web-based where OSHA permits it. The KO, with the local SOHO, may accept equivalent training (2-3.b(1)(a)).Same as Level 1 (2-3.b(2)(a)).
Ongoing training24 hours of documented safety and health training within the past five years, then 24 hours every three years for the life of the contract. The OSHA 30 does not count toward the 24 (2-3.b(1)(b)).Same as Level 1 (2-3.b(2)(b)).
ExperienceAt least five years of cumulative safety experience in the last ten, managing or implementing a safety program on projects similar in type, size and complexity (2-3.b(1)(c)).At least three years in the last ten, on the same terms (2-3.b(2)(c)).
Shorter experience pathThree years with a safety-related degree or a nationally accredited (ANSI, NCCA or CESB) safety certification that takes at least three years of experience to earn.Two years with a safety-related degree or an accredited certification that takes at least two years of experience to earn.
BCSP credentialsThe CSP (four years of experience to earn) and the CHST and OHST (three years each) qualify for the shorter path. The ASP (one year) does not.The CSP, CHST and OHST qualify. The ASP does not.
LimitsMay not supervise non-safety personnel at the site of work (2-8.b(2)(a)). Required on projects with a high or extremely high residual risk assessment code (2-8.b(2)(f)).Cannot be assigned to projects with a high or extremely high residual risk assessment code (2-2.x(2)).
AdjustmentsThe KO, with the local SOHO, may adjust the training and experience requirements (notes to 2-3.b) and may change the full-time Level 1 requirement in the contract documents (2-8.b(3)). Your contract governs.

Level 3 and alternates. A Level 3 SSHO is a designated Competent or Qualified Person with the experience to identify hazards and put controls in place for the work being performed (2-3.b(3)), and, like Level 2, cannot be assigned to a high or extremely high residual risk project. An Alternate SSHO meets the contract-required level but is not the primary (2-2.x(4)). If the Level 1 SSHO has to leave the site for up to 24 hours, a Level 1, 2 or 3 SSHO may cover in the interim; for longer than 24 hours, an alternate Level 1 must be at the site (2-8.b(2)(c) and (d)).

The BCSP experience minimums come from BCSP’s Credentials At-A-Glance, and all BCSP certifications are accredited by the ANSI National Accreditation Board (ANAB) to ISO/IEC 17024. Before a résumé goes out, we verify every credential with the issuing body.

ENG Form 6282 (SSHO Designation Letter): Who Signs, When It’s Due, What the KO/COR Checks

What it is. ENG Form 6282, the Site Safety and Health Officer Designation Letter, is the mandatory USACE form that designates each SSHO in writing. EM 385-1-1 (2024) requires one for every level of onsite SSHO, and a new or additional SSHO means a new letter (paras 2-8.b(1) and 2-10.c).

Where to get it. USACE publishes the form as a PDF on its publications site. Check the USACE Engineer Forms library for the current version before you submit it.

Who signs it. Two people. The prime contractor’s Corporate Safety Official designates the SSHO on the form and is responsible for making sure the person meets the paragraph 2-3 minimum training and experience requirements (para 2-4.f(1)). The SSHO signs to acknowledge the roles and responsibilities in paragraph 2-4.b (para 2-4.b(9)).

When it’s due. Before any work. The signed form goes to the Contracting Officer (KO) or the Contracting Officer’s Representative (COR) for acceptance, work must not be conducted until it is accepted, and the contractor keeps a copy of the accepted form at the site of work (para 2-8.b(1)). The manual also has the contractor review and approve its own safety submittals before they go to the government (para 2-8.c(2)).

What the KO/COR checks. The manual describes a cursory review: the KO or COR looks at contractor safety submittals, proof of qualification included, to determine whether they generally conform to the contract’s safety and occupational health requirements. Conforming submittals are accepted; others are returned for correction. Acceptance does not relieve the contractor of its responsibilities (para 2-8.c(3) and its note). So the package has to show, on its face, that the named person meets the level your contract requires.

What goes with it. Every designation package we build carries the evidence behind the signature:

  • The completed ENG Form 6282, ready for the Corporate Safety Official’s and the SSHO’s signatures.
  • The OSHA 30 card, or the equivalent training the KO accepted.
  • Certificates for the 24 hours of documented safety and health training in the past five years, with dates, hours and providers.
  • A résumé that shows the years of safety experience in the last ten on similar projects, with dates.
  • Degree or certification records for the shorter experience path, verified with the issuing body.
  • Anything your contract adds, such as a named course, a certification or installation badging.

Our free SSHO Submittal Checklist (PDF) puts every item on one printable page, with the EM 385-1-1 paragraph behind each one.

What Your SSHO Owns on Site

The 2024 manual (paragraphs 2-4.b, 2-5.b and 2-8) and UFGS 01 35 26 spell out the job on a federal construction site. The SSHO we place is expected to:

  • Be at the site of work whenever work is performed, with full mobility and access to every major operation, and not supervise non-safety personnel (Level 1).
  • Keep the manual, safety data sheets and the Accident Prevention Plan on site and keep the APP current; the APP itself is developed by a Competent Person and approved by the prime’s corporate safety official.
  • Review and sign Activity Hazard Analyses for each definable feature of work, keep the AHA signature log, and make sure the Competent and Qualified Persons named in each AHA are on site.
  • Conduct and document daily safety inspections, maintain the deficiency tracking log, and make sure findings appear in the daily production or QC report.
  • Attend preparatory and initial-phase meetings, run weekly safety meetings and monthly supervisor meetings, and keep the minutes and orientation records.
  • Report and investigate accidents and near misses on ENG Form 3394 — notification to the KO/COR within 8 hours for fatalities, in-patient hospitalizations, amputations, eye loss or property damage over $600,000, within 24 hours for everything else, and the completed form within 7 days.
  • Serve as the safety point of contact for the government’s quality assurance representative and escort and brief visitors.

If your contract layers NAVFAC, VA, AFCEC, GSA or DOE requirements on top of the manual — separate-from-superintendent rules, monthly outside inspections, 2-hour mishap notifications, installation badging — we screen for those too.

How We Screen SSHO Candidates

Federal submittals are rejected on details, so the screen is document-first:

  • The spec before the search. We read your Section 01 35 26 (or the VA/NAVFAC equivalent) and the residual RAC to confirm the SSHO level, experience years, certification language and separation-of-duties rules that actually apply.
  • Experience math. Cumulative safety years within the last ten, on projects of similar type, size and complexity, reconstructed from the résumé and confirmed with references — not the candidate’s own summary.
  • Training records. OSHA 30 card, the 24 hours of documented safety and health training within the past five years, First Aid/CPR, and any contract-specific course (40-hour EM 385-1-1, HAZWOPER, competent-person training) with dates and providers. See our guide to SSHO training requirements.
  • Credentials verified with the issuing body — BCSP registry lookups for CSP, CHST, ASP and OHST; OSHA outreach card verification; NCCCO verification for crane-heavy scopes.
  • Federal history. Which agency, District or command, what the QA representative expected, and whether the candidate has written or maintained an APP and AHAs. References are called.
  • Access and clearance. CAC eligibility and, for cleared work, prior clearance history are confirmed per candidate; sponsorship runs through the prime’s facility security officer, never through us.
  • Your requirements. Background checks, drug screening, MVR and medical clearances are run to your contract’s standard before mobilization.

Availability and Timeline — Presentation, Approval, Acceptance, Arrival

Federal placements have one more gate than commercial work (where the same seat is usually filled by a site safety manager), so we separate the steps rather than promising a single number:

  • Same business day — scoping. You talk to Patrick Salazar, not a call center. We capture the contract’s safety spec, the site, the schedule, the start date, badging and access requirements, and who accepts the SSHO on your side.
  • Within 48 hours — candidates presented. Résumés with credential summaries, verified dates, and references, matched to the spec. For urgent needs we present whoever on the bench is genuinely available, and say so if the fit is partial.
  • Your approval — on your schedule. You interview and choose. Nobody is mobilized until you approve a named person and the written agreement and rates are signed.
  • Mobilization — after approval. Local professionals can often start within days. Traveling professionals typically mobilize within about a week of approval; travel, lodging, badging, drug screening and site orientation set the real date. Federal and cleared work adds the government’s own acceptance steps (see below).
  • Certificate of insurance — at contract execution. Issued before mobilization, with additional-insured, waiver-of-subrogation and primary/non-contributory wording where your contract requires it.

Government acceptance. After you approve a candidate, the ENG Form 6282 designation (and the APP, if it names the SSHO) goes to the Contracting Officer or COR for acceptance. Work may not proceed until it is accepted, and the acceptance is a cursory review that does not shift responsibility from the contractor (EM 385-1-1 paras 2-8.b(1) and 2-8.c(3)). CAC issuance and installation badging run in parallel and can take from a few days to several weeks for a first-time badge on an installation. We build the submittal package so the review has nothing to bounce.

Replacements. When a designated SSHO leaves mid-contract, the same steps repeat in compressed form: candidates within 48 hours, an interim SSHO of the required level covering absences longer than 24 hours where the contract allows, and a new ENG 6282 to the KO/COR. Emergency requests go directly to the owner.

What Drives SSHO Staffing Cost

We do not publish a rate sheet, because the same title can price very differently from one contract to the next. Every engagement is quoted in writing after the scoping call, and the quote states the hourly rate, the 40-hour weekly minimum, how overtime is treated, per diem and mobilization terms, and how long the quote is valid. What moves the number:

  • Credential level the spec requires — a contract that calls for a CSP or an SSHO with federal history prices above a role that OSHA 30 and field experience can fill.
  • Schedule — hours per week, shifts, weekend pours or outages, and whether overtime is worked. Overtime is billed only if it is worked and only as the quote states.
  • Duration — short bridge coverage, a defined project, or a multi-month program with option periods.
  • Location and travel — local professionals carry no travel cost; traveling professionals add GSA-basis per diem, lodging and a mobilization/demobilization charge, which the quote itemizes.
  • Site-access requirements — badging, background checks, drug screening, medical clearances and site-specific training add lead time and, sometimes, cost.
  • Federal documentation load — APP authorship, AHA development and monthly reporting are quoted as separate deliverables when you want them, so the hourly rate stays clean.

The rate includes the professional’s pay and payroll burden, workers’ compensation, general liability, professional liability and umbrella coverage, credential verification and our management of the engagement. Nothing is added after the fact that is not in the quote.

Onboarding: From Approval to the Pre-Construction Conference

  • Written agreement first. Rates, schedule, per diem, mobilization, notice terms and the professional’s employment status are signed before anyone travels.
  • Submittal package. Résumé formatted to the spec, credential copies with verification notes, training certificates with dates, references, and the completed ENG Form 6282 ready for the corporate safety official’s signature. The SSHO Submittal Checklist (PDF) lists every piece.
  • Insurance and vendor setup. Certificate of insurance at contract execution; W-9, vendor forms and portal registrations handled on our side.
  • Access. CAC or installation badging, background and drug screening, and any site or agency orientation coordinated with your project team.
  • Day one. The SSHO reviews the APP and AHA library, walks the site, attends the pre-construction conference with the government’s representative, and sets up the inspection log, deficiency tracking and meeting cadence the contract requires.

Salazar Industries is fully insured: general liability, professional liability, umbrella, workers’ compensation and commercial auto coverage, with COIs on request. Certificates naming your organization as additional insured, with waiver of subrogation and primary/non-contributory wording where your contract requires them, are issued at contract execution. We are registered in SAM.gov as a small business (UEI and CAGE code on request) and can be set up in ISN, Avetta, Veriforce or your own vendor portal on request.

Ongoing Support During the Contract

  • One point of contact. The owner who scoped the engagement stays on it. Extensions, headcount changes, shift changes and paperwork go through one person.
  • Check-ins. We check in with you and with the SSHO during the first week and at regular intervals afterward, and we ask for the honest version.
  • Replacement support. If a placement is not the right fit, tell us. We work with you on a replacement; the specific replacement and notice terms are stated in your written agreement.
  • Coverage for absences. Planned leave and sick days are coordinated in advance so the site is not left without the coverage your contract requires.
  • Documentation and billing. Timesheets are approved by your designee before invoicing; invoices follow the quote line by line.

Where SSHOs Are Required

SSHO designation shows up wherever FAR 52.236-13 Accident Prevention and EM 385-1-1 flow into a construction contract: USACE-administered military construction and civil works (locks, dams, levees, dredging, hydropower), NAVFAC facility work, AFCEC airfield projects, VA medical center construction under the VA’s own Section 01 35 26, and GSA or DOE projects that adopt the manual by reference. Subcontractors on those projects sometimes need their own safety coverage under the prime’s APP, and prime contractors bidding their first federal job often need help interpreting the spec before they need a person.

We place SSHOs nationwide from our Goldsboro, North Carolina headquarters. Related pages: USACE EM 385-1-1 safety staffing, DoD and military projects, VA hospital construction, GSA federal buildings.

Frequently Asked Questions

What qualifications does an SSHO need under EM 385-1-1?
Under the 15 March 2024 edition, a Level 1 SSHO needs OSHA 30-hour construction or general industry training, 24 hours of documented safety and health training within the past five years (then 24 hours every three years during the contract), and at least five years of cumulative safety experience within the last ten on projects of similar type, size and complexity — three years with a safety-related degree or a nationally accredited safety certification that takes at least three years of experience to earn, such as the CSP or CHST. Level 2 needs three years (two with a degree or an accredited certification that takes at least two years to earn). The manual does not require a 40-hour EM 385 course or a BCSP credential; contract specifications may add them. The 2014 edition required 8 hours of documented training every year; the 2024 edition replaced it with 24 hours every three years.

Is there an “EM 385 certification” or “certified SSHO”?
No. USACE does not certify SSHOs. Each SSHO is designated on ENG Form 6282, signed by the contractor’s corporate safety official and the SSHO, and accepted by the Contracting Officer or COR before work starts. Training-vendor “EM 385 certificates” document a course, not a government credential.

What is ENG Form 6282?
ENG Form 6282 is the Site Safety and Health Officer Designation Letter, the mandatory USACE form that designates each SSHO in writing. EM 385-1-1 requires one for every level of onsite SSHO, a new or additional SSHO needs a new letter, and the contractor keeps a copy of the accepted form at the site of work (paras 2-8.b(1) and 2-10.c).

Who signs ENG Form 6282, and when is it due?
The prime contractor’s Corporate Safety Official and the SSHO. The Corporate Safety Official designates the SSHO and is responsible for confirming the paragraph 2-3 training and experience minimums; the SSHO signs to acknowledge the roles and responsibilities. It goes to the Contracting Officer or COR before any work, and work must not start until it is accepted (paras 2-4.f(1), 2-4.b(9) and 2-8.b(1)).

What does the Contracting Officer or COR check on an SSHO submittal?
EM 385-1-1 describes a cursory review of contractor safety submittals, including proof of qualification, to determine whether they generally conform to the contract’s safety and occupational health requirements. Conforming submittals are accepted, others are returned for correction, and acceptance does not relieve the contractor of its responsibilities (para 2-8.c(3)).

Which edition of EM 385-1-1 applies to my project?
The edition in effect on the solicitation date. Contracts solicited on or after 15 March 2024 use the 2024 edition; earlier solicitations stay on the 30 November 2014 edition until completion. UFGS 01 35 26 ties compliance to the edition at the date of solicitation.

How fast can you provide an SSHO?
Candidates are presented within 48 hours of a scoped request. Mobilization follows your approval, the government’s acceptance of the ENG Form 6282 designation, and badging; local candidates can often start within days and traveling candidates typically within about a week of approval. Emergency requests are scoped the same day.

Can you provide an Alternate SSHO?
Yes. The manual requires an alternate of the contract-required level for absences longer than 24 hours, and UFGS 01 35 26 requires an alternate to be named on most contracts. We can staff the alternate seat or coordinate coverage with your existing staff.

Do you write Accident Prevention Plans and AHAs?
Yes, as separately quoted deliverables. The 2024 manual requires the APP to be developed by a Competent Person and approved by the prime’s corporate safety official (ENG Form 6293 worksheet), and AHAs for each definable feature of work (ENG Form 6206). We can author, review or update them.

Do you have SSHOs with security clearances?
For cleared work we source clearance-eligible professionals and verify clearance history per candidate. Sponsorship and reactivation always run through the prime contractor’s facility security officer under the contract, not through us.

What does SSHO staffing cost?
Rates depend on the SSHO level and certification the spec requires, the schedule, the duration, the location and travel, and site-access requirements. Every engagement is quoted in writing after a scoping call, and the quote states the hourly rate, the 40-hour weekly minimum, overtime treatment, per diem and mobilization terms, and validity.

Ready to staff an SSHO on your federal project?

Candidates screened to EM 385-1-1 and your contract spec, presented within 48 hours, with the submittal package and ENG Form 6282 designation handled.

☏ Call (252) 229-5238 Free Quote
Scroll to Top
309 N William St, Goldsboro, NC 27530  |  (252) 229-5238  |