EM 385 Requirements: EM 385-1-1 Contractors Guide
Written by
Patrick Salazar, Owner & Lead Safety Consultant
OSHA-authorized trainer with 10+ years of experience in construction and industrial safety management. Read more about the author
USACE EM 385-1-1 is more prescriptive than OSHA 1926 and the document workflow matters as much as field practice. This guide walks through APP authorship, AHA library, SSHO designation, three-phase control system, weekly safety reporting, and mishap notification.
Need EM 385 compliance support or APP authorship?
SSHO candidates screened against the EM 385-1-1 Chapter 2 criteria and your contract’s Section 01 35 26, with APP and AHA support, ENG 3394 reporting fluency, and three-phase control documentation.
Same-day scoping for QAR stop-work response; candidates presented within 48 hours. APP authorship as a fixed-fee deliverable; SSHO staffing for the project duration.
EM 385-1-1 Requirements for Contractors — A Practical Guide
EM 385-1-1 is the U.S. Army Corps of Engineers safety and health requirements manual for USACE-administered construction; the 15 March 2024 edition applies to contracts solicited on or after that date. Contractors submit a site-specific Accident Prevention Plan before work starts, prepare an Activity Hazard Analysis for each definable feature of work, and designate a qualified SSHO.
USACE EM 385-1-1 (Safety and Occupational Health Requirements, titled the Safety and Health Requirements Manual before 2024) is the federal construction safety governance manual published by the U.S. Army Corps of Engineers. The current edition is dated 15 March 2024 and applies to contracts solicited on or after that date; earlier solicitations remain under the 30 November 2014 edition, so always confirm which edition your contract cites. EM 385 governs Army and Air Force MILCON, USACE civil works (locks, dams, levees, hydropower), federal water projects, VA hospital construction administered through USACE, and other USACE-administered work. The manual is more prescriptive than OSHA 1926 baseline; where EM 385 is more conservative, EM 385 governs.
This guide walks through what contractors need to do to comply with EM 385: APP authorship, AHA library, SSHO designation, three-phase control system, weekly safety reporting, monthly exposure reporting, mishap notification, and the document workflow that distinguishes a USACE-compliant program from OSHA-baseline compliance.
Owner Patrick Salazar has worked crane, rigging and site-safety scopes on federal and commercial projects since 2005 — NCCCO Mobile/Tower/Inspector/Lift Director, OSHA 500 instructor — and supports USACE contractors as a subcontractor. EM 385 is more prescriptive than OSHA 1926 and the document workflow matters as much as the field practice. This guide walks through what contractors actually need to do.
The 15 March 2024 edition is organized in 37 chapters. Chapter 1 covers safety and occupational health program management for USACE personnel, and Chapter 2 covers the contractor program: the APP, AHAs, SSHO qualifications and accident reporting. Chapters 3 through 37 are the technical requirements: Medical and First Aid (3), Temporary Facilities (4), Personal Protective and Lifesaving Equipment (5), Hazardous or Toxic Agents and Environments (6), Lighting (7), Accident Prevention Signs, Tags, Labels, Signals, and Traffic Control (8), Fire Prevention and Protection (9), Welding and Cutting (10), Electrical (11), Control of Hazardous Energy (12), Hand and Power Tools (13), Material Handling, Storage, Disposal, and Conveyors (14), Rigging (15), Load Handling Equipment (16), Demolition, Renovation, and Re-Occupancy (17), Vehicles, Machinery, and Mechanized Equipment (18), Floating Plant and Marine Activities (19), Pressurized Equipment and Systems (20), Fall Protection (21), Working Platforms and Scaffolding (22), Rope Access (23), Safe Access (24), Excavation and Trenching (25), Underground Construction, Shafts, and Caissons (26), Concrete, Masonry, Roofing, and Wood Construction (27), Steel Erection (28), Blasting (29), Diving Operations (30), Tree Maintenance and Removal (31), Airfield and Aircraft Operations (32), Uncrewed Aircraft (33), Confined Space (34), Sanitation (35), Hazardous Waste Operations and Emergency Response (36), and Emergency Operations (37). The superseded 30 November 2014 edition was organized in numbered sections instead (Section 01, Section 02 and so on), which is why older contract specifications cite paragraphs such as 01.A.17.
Table of Contents
Section numbers follow the EM 385-1-1 (2014) edition, which still governs contracts solicited before 15 March 2024; the 2024 edition moved contractor requirements to Chapter 2 (SSHO qualifications at paragraph 2-3.b, designation on ENG Form 6282).
Where to Get the Current EM 385-1-1 Manual and Which Edition Applies
The current manual is EM 385-1-1, Safety and Occupational Health Requirements, dated 15 March 2024. It superseded the 30 November 2014 edition, and USACE publishes it in full as a PDF on the USACE publications site.
You will also see the number written as EM385-1-1, with no space, and older specs and plans often call it the USACE Safety and Health Requirements Manual, the title it carried before 2024.
On construction contracts, which edition binds your job depends on the solicitation date, not the award date. Under FAR Clause 52.236-13, contractors comply with the version in effect on the date of solicitation, including interim changes, and existing contracts stay on the previous edition until completion. Before making an offer, check for interim changes.
Where 2014 citations moved in the 2024 manual
Older specs and plans still cite the 2014 numbering. Use this table to find the same topic in the current manual.
| Topic | 2014 edition | 2024 edition |
|---|---|---|
| Contractor program | Section 01, shared with USACE personnel | Chapter 2 (Chapter 1 now covers USACE personnel) |
| Accident Prevention Plan | Section 01.A.12 and Appendix A | Paragraph 2-7.b and mandatory ENG Form 6293 |
| Activity Hazard Analysis | Section 01.A.14 | Paragraph 2-6 |
| SSHO requirements | Section 01.A.17 | Paragraphs 2-2.x (levels), 2-3.b (qualifications), 2-4.b (roles) and 2-8.b (staffing), with mandatory ENG Form 6282 |
| SSHO ongoing training | 8 hours every year | 24 hours within the past five years, then 24 hours every three years (paragraph 2-3.b(1)(b)) |
| Government Designated Authority | GDA | Term removed; for contract work it is now the responsibility of the KO or COR |
This is a locator, not a conversion guide. Check every citation against the manual your own contract incorporates.
The APP (Accident Prevention Plan) — What Contractors Must Author
The APP is the central document for any USACE construction contract. Section 01.A of the 2014 edition and paragraph 2-7.b of the 2024 edition set the APP requirements.
- APP timing — the APP is submitted for government review before work begins (UFGS 01 35 26 calls for it 15 calendar days before the start of work); it is accepted by the Contracting Officer or COR, and acceptance is a cursory review that does not relieve the contractor of responsibility.
- Site-specific scope — APP must be specific to the project, not generic. Must reference site conditions, contract scope, anticipated subcontractors, and project-specific hazards.
- SSHO designation — the SSHO is identified in the APP and formally designated on ENG Form 6282 (2024 edition), signed by the corporate safety official and the SSHO and accepted by the KO or COR before work begins.
- Organization and safety responsibilities — corporate safety policy, project organizational chart, responsibility matrix.
- Subcontractor coordination — how the prime will coordinate safety with subcontractors; lower-tier subcontractor management.
- Training plan — what training is required for project workforce; how training will be delivered and documented.
- Activity Hazard Analysis (AHA) commitment — APP commits to AHA development for each definable feature of work.
- Three-phase control system commitment — APP commits to preparatory, initial, and follow-up phase meetings for each definable feature.
- Safety inspection cycle — daily walkthrough commitment, weekly inspection cycle, monthly audit commitment.
- Mishap notification and investigation — Class A/B/C/D classification, notification timelines, investigation procedures, ENG 3394 reporting.
- Emergency response plan — emergency contacts, evacuation procedures, fire suppression, medical response.
- HAZWOPER plan if applicable — for environmental restoration scope under EM 385 Section 28 (2014 edition; Chapter 36 in the 2024 edition).
- Site-specific safety plan supplement — for owner-specific requirements beyond EM 385 (e.g., VA hospital ICRA).
AHA (Activity Hazard Analysis) by Definable Feature of Work
Activity hazard analyses (AHAs) are the operational documents for EM 385 compliance. Each definable feature of work gets its own AHA.
- Definable feature definition — discrete portion of project work having its own hazard profile. Examples: site clearing, excavation, foundation work, structural steel erection, MEP rough-in, building envelope, finishes, commissioning. Each is a definable feature.
- AHA content requirement — task description, hazards by step, controls by step (engineering, administrative, PPE), training requirements, inspection requirements, equipment used.
- Submitted to QAR before activity begins — AHA must be developed and submitted to QAR before the definable feature begins on site.
- Three-phase control system trigger — preparatory phase meeting follows AHA submission; initial phase inspection at first work performed; follow-up phase meetings recurring during the activity.
- AHA update triggers — scope change, new hazard identified, near-miss or incident, regulatory change.
- AHA library — most contractors maintain a library of standardized AHAs that get tailored to each project.
- Critical operations identified — certain high-risk activities (critical lifts, energized work, confined space entry, blasting) get more detailed AHA plus specific permitting.
- Subcontractor AHA — subcontractors typically develop their own AHAs for their scope; prime SSHO reviews subcontractor AHAs before activity begins.
- AHA training delivery — workers performing the activity must be trained to the AHA. Training documentation required.
- AHA execution evidence — documented preparatory phase meeting, initial phase inspection report, follow-up phase meeting minutes. Each archived in project file.
Three-Phase Control System — Preparatory, Initial, Follow-Up
The three-phase control system is what distinguishes EM 385 operational discipline from OSHA-baseline compliance.
- Preparatory phase meeting — held before each definable feature of work begins. Attended by: SSHO, project manager, superintendent, subcontractor foreman, QAR (typically). Reviews: AHA hazards and controls, training status, equipment, materials, work sequence, anticipated conditions.
- Initial phase inspection — conducted when first work on the definable feature is performed. Verifies: AHA controls are in place, training has been delivered, equipment is operational, work practices match AHA.
- Follow-up phase — recurring inspections during the activity to verify continued compliance with AHA. Frequency varies by hazard level; typically daily for high-hazard activities, less frequent for lower-hazard.
- Documentation requirements — each phase has documented meeting minutes or inspection report. Maintained in project file. Reviewed by QAR.
- QAR participation — USACE QAR typically attends preparatory phase meeting; may attend initial phase inspection at QAR discretion; reviews follow-up phase reports periodically.
- Subcontractor integration — subcontractors participate in three-phase control system for their scope. Prime SSHO coordinates across subcontractor activity.
- Scope changes trigger reset — significant scope change requires AHA update and three-phase reset for the affected portion of work.
- Near-miss or incident response — near-miss or recordable incident in definable feature triggers review of AHA effectiveness and potential three-phase reset.
- Sign-off requirements — preparatory phase meeting requires SSHO sign-off, subcontractor foreman sign-off, attendance documentation.
- Quality integration — three-phase control system parallels USACE quality control three-phase system; some contractors integrate safety and quality phases for efficiency.
Weekly Safety Reports, Monthly Exposure Reports, and ENG 3394
The reporting cadence below is what USACE QAR receives and reviews.
- Periodic safety reporting — cadence is set by the contract and District: daily inspection logs typically ride the daily QC report, weekly safety-meeting minutes are kept, and many contracts require weekly or monthly safety reports capturing hours worked, incidents, near misses, training delivered, inspection findings and corrective actions.
- Monthly exposure (man-hour) reporting — most USACE contracts require monthly reporting of hours worked by the prime and subcontractors together with recordable, lost-time and fatality counts, which feeds project TRIR and DART rates.
- ENG Form 3394 accident and near-miss report — the 2024 manual requires ENG 3394 for accidents and near misses. Notify the KO/COR within 8 hours for the most serious events (fatality, in-patient hospitalization, amputation, eye loss, or property damage over $600,000) and within 24 hours for everything else. The completed form is due within 7 days.
- Mishap classification and notification — DoD/Army accident classes (DoDI 6055.07) run from A to D. Class A is a fatality, permanent total disability, or property damage of $2.5 million or more. Class B is $600,000 to under $2.5 million, permanent partial disability, or three or more people hospitalized. Class C is $60,000 to under $600,000 or a lost-time injury. Class D is $25,000 to under $60,000 or a recordable injury. Under the 2024 manual (Table 2-1), fatalities, in-patient hospitalizations, amputations, eye loss or property damage over $600,000 must be reported to the KO/COR within 8 hours; all other accidents and near misses within 24 hours; the completed ENG Form 3394 within 7 days.
- Safety stand-downs — serious mishaps commonly trigger a contractor stand-down at the KO/COR’s direction; the SSHO leads the all-hands review of the event and corrective actions and documents attendance.
- ENG 3394 follow-up — initial report at event; final report after investigation complete with root-cause analysis and corrective action plan.
- Other incident reports — property damage to government property, equipment damage, near-miss with potential for serious consequence.
- Report distribution — reports go to USACE QAR, project safety office, sometimes higher District safety leadership. Multi-prime projects may share reports across primes.
- Recordkeeping retention — all reports retained in project file for project duration plus statutory retention period.
- Lessons learned distribution — significant incidents may be shared across USACE Districts as lessons learned.
EM 385 Documentation Workflow — What Contractors Actually Do
The workflow below is what a USACE-compliant contractor actually runs.
- Pre-bid stage — review RFP/IFB for EM 385 references, SSHO qualifications, customer-specific safety overlay. Estimate APP authorship effort plus SSHO staffing cost. Build into pricing.
- Award stage — APP authorship begins. SSHO candidate identification. Subcontractor prequalification.
- Pre-construction stage — APP submitted to QAR. SSHO designated. Pre-construction safety conference scheduled.
- Pre-construction safety conference — SSHO leads kickoff with QAR, prime, subcontractors. APP reviewed and approved. AHA structure presented. Three-phase control system commitment confirmed.
- Mobilization stage — initial AHAs developed for first definable features. Workforce training delivered. Equipment inspected. Site-specific orientation delivered.
- Daily operations — SSHO walkaround, JHA tailgate meetings, hazard communication, observation. Daily report.
- Weekly cadence — weekly safety report submitted to QAR. Weekly safety meeting with prime/subcontractor leadership.
- Monthly cadence — monthly exposure report submitted. Monthly facility audit. QAR safety review meeting.
- Per-definable-feature workflow — AHA developed and submitted; preparatory phase meeting; initial phase inspection; follow-up phase recurring; AHA updates if needed.
- Incident response workflow — incident occurs; medical response; ENG 3394 initial report; investigation; root-cause analysis; ENG 3394 final report; safety stand-down if Class A or B; corrective action plan.
- Closeout stage — final exposure report; final mishap log review; project safety file archive; lessons learned documentation.
- Post-project review — USACE review of contractor safety performance feeds into past performance for future bids.
Cost of EM 385 Compliance & APP Authorship
Direct cost categories for EM 385 compliance.
- APP authorship (standalone deliverable) — quoted per scope depending on project scope and complexity. Includes AHA library development for anticipated definable features.
- SSHO staffing (project-duration) — hourly contract rates that vary by credential tier, location and duration depending on credential, experience, clearance status. 40 hours per week × project duration; for a 12-month USACE MILCON project, budget the quoted straight-time rate × 40 hours × 52 weeks, plus per diem if the SSHO travels.
- EM 385 40-hour training — priced per class (or per day), not per seat; required where a contract specifies it (the manual itself requires OSHA 30 plus 24 hours of documented safety training within five years).
- EM 385 train-the-trainer course — quoted per trainer; allows in-engagement EM 385 training delivery.
- AHA library development (one-time) — a reusable AHA library for typical scope, quoted per scope; tailoring to each project requires additional effort.
- Three-phase control system documentation — typically built into SSHO time; documentation templates quoted per scope.
- Weekly safety report and monthly exposure report templates — typically built into SSHO time; USACE provides forms.
- EHS platform configuration — for contractors with multiple concurrent USACE projects, EHS platform configured for USACE document workflow, quoted per scope.
- Pre-bid technical proposal safety section — typical USACE bid requires safety section in technical proposal; quoted per bid.
- CAC processing for SSHO — typically no direct cost; first-time CAC timing varies by installation, so build it into the schedule.
- Secret clearance reactivation — for cleared scopes through prime sponsorship; no direct contractor cost but timeline implication.
- Total EM 385 compliance cost — depends on project scope and complexity, and is quoted per project.
EM 385 Credentials & Required Training
The credential roster for EM 385 compliance. Still scoping what the SSHO position itself owns on a USACE site—authority, reporting lines, and when the role must be full-time—start with our guide to the SSHO role, then work the checklist below.
- BCSP credentials — CSP, CHST, ASP, OHST. There is no official EM 385-1-1 certification from USACE. The manual sets training and experience criteria for a Site Safety and Health Officer (SSHO), and your contract may add EM 385-1-1 training on top. The manual does not require a BCSP credential, but an ANSI/NCCA-accredited certification reduces the required experience from five years to three under the 2024 edition, and some contract specifications (notably the VA’s) require a professional safety certification outright.
- EM 385-1-1 training — the manual itself requires an OSHA 30-hour card plus 24 hours of documented safety and health training within the past five years (and every three years during the contract). A 40-hour EM 385-1-1 course is a contract-specific requirement (for example NAVFAC Pacific/Hawaii/Marianas and VA specifications), not a USACE credential.
- Refresher training — the 2014 edition required 8 hours of documented training every year; the 2024 edition replaced it with 24 hours every three years.
- OSHA 30 Construction — required for every SSHO level (general industry is accepted for general-industry work); the designation itself is made on ENG Form 6282, signed by the contractor’s corporate safety official and the SSHO and accepted by the Contracting Officer or COR before work starts.
- OSHA Subpart M, P, L, R, AA, Z competent person designations — fall protection, excavation, scaffolds, steel erection, confined space, hazardous substances.
- NCCCO Mobile Crane, Tower Crane, Crane Inspector, Lift Director, Signal Person, Rigger — for crane-heavy USACE scopes.
- HAZWOPER 40 — for environmental restoration scope under EM 385 Section 28 (2014 edition; Chapter 36 in the 2024 edition).
- EM 385-1-97 Explosives Safety — for ordnance and explosives work under MMRP.
- UXO Awareness — for MMRP and range clearance scope.
- DD-214 (former military) — for clearance eligibility through prime sponsorship.
- CAC eligibility — for federal installation work.
- Secret clearance eligibility — through prime sponsorship for cleared scopes.
- First Aid / CPR / AED — current AHA BLS or Red Cross.
- Experience — five years of cumulative safety experience within the last ten on projects of similar type, size and complexity (three years with a safety degree or accredited certification) under the 2024 edition; five years of continuous construction safety experience under the 2014 edition. Verified through references.
- Customer-agency-specific orientations — service-specific overlays may add Army Garrison-specific safety, Air Force AFI 91-203, Navy SOH-9510 familiarity.
When Contractors Need EM 385 Compliance Support
The patterns below trigger outside EM 385 compliance engagement.
- First USACE bid pursuit. Contractor pursuing first USACE project needs EM 385 compliance posture before bid submission. APP template development, SSHO identification, AHA library start.
- APP authorship under tight bid timeline. Award imminent; UFGS 01 35 26 paragraph 1.9.2 calls for the APP at least 15 calendar days before the start of work after notice to proceed. NAVFAC Pacific projects use different timing tied to the preconstruction conference, so check your spec. APP authorship as fixed-fee deliverable paired with SSHO mobilization.
- SSHO replacement mid-project. Named SSHO departed; project requires SSHO designation continuity. Replacement SSHO candidates presented within 48 hours; the new ENG Form 6282 designation is coordinated with the KO/COR.
- QAR safety stop-work. USACE QAR issued safety stop-work order. Senior EM 385 SSHO candidates presented within 48 hours for corrective action plan authoring, three-phase reset, SSHO reassignment if applicable.
- Mishap response. Class A or B mishap occurred. Senior safety professional scoped the same day for investigation, ENG 3394 reporting, safety stand-down facilitation, corrective action plan.
- Multi-District contractor. Firm with concurrent USACE projects across multiple Districts; pre-bench retainer arrangement for forward schedule.
- New definable feature outside SSHO experience. Project includes scope outside SSHO’s prior experience; AHA development support.
- Customer audit response. USACE customer scheduled audit of contractor safety program; gap audit and remediation before audit.
- SSHO training delivery. Contractor needing in-house SSHO bench development; an experienced EM 385 instructor delivers 40-hour training.
- Multi-customer federal expansion. Contractor expanding from USACE to NAVFAC, AFCEC, VA, DOE; cross-agency compliance support.
Direct line to the owner: 252-229-5238. Patrick takes initial calls for EM 385 compliance and SSHO scoping.
EM 385-1-1 vs. OSHA: The Differences That Catch Contractors
Contractors coming onto their first USACE or NAVFAC job usually assume EM 385-1-1 is “OSHA with extra paperwork.” It is a different animal, and the differences are exactly where first-timers lose schedule. OSHA is regulation — enforced by compliance officers, after the fact, through citations and penalties. EM 385-1-1 is contract — enforced by the contracting officer and QA staff who are already on your project, in real time, with remedies that hurt faster than any citation: work stoppages, withheld payment, and cure notices.
The operational differences follow from that. OSHA never asks for your safety plan before you mobilize; EM 385 work does not start until the APP is submitted and accepted. OSHA has no role called SSHO; EM 385 contracts name one, spell out the qualifications, and frequently require the position full-time and on-site. OSHA inspects when it shows up; the three-phase control system inspects your own work continuously and expects the records to prove it. And where the two books disagree, the answer is not “pick one” — the more stringent requirement governs, and both apply at all times.
The practical takeaway: OSHA compliance keeps you legal; EM 385-1-1 compliance keeps you paid. Contractors who treat the manual as a bid-time formality end up discovering it as a schedule problem — usually in the preparatory phase meeting, in front of the government.
Federal work also raises the prequalification bar beyond the manual itself: many energy and federal-adjacent owners screen contractors through ISNetworld before EM 385 competence ever gets evaluated. Our ISNetworld compliance guide for contractors covers RAVS documents, Q&A statistics, and owner grade thresholds, which matter most on oil and gas and industrial plant work.
Frequently Asked Questions About EM 385-1-1 Requirements for Contractors
What is EM 385-1-1 and who must comply?
EM 385-1-1 (Safety and Occupational Health Requirements) is the safety manual published by the U.S. Army Corps of Engineers. The current edition is dated 15 March 2024 and applies to contracts solicited on or after that date; contracts solicited earlier remain under the 30 November 2014 edition until completion. Compliance required for Army and Air Force MILCON, USACE civil works (locks, dams, levees, hydropower), federal water projects, VA hospital construction administered through USACE, and other USACE-administered work. More prescriptive than OSHA 1926; where EM 385 is more conservative, EM 385 governs.
What is required for SSHO designation under EM 385?
Designation on ENG Form 6282, signed by the contractor’s corporate safety official and the SSHO and accepted by the Contracting Officer or COR before work starts. Under the 2024 edition a Level 1 (full-time) SSHO needs OSHA 30-hour construction or general industry training. The SSHO also needs 24 hours of documented safety and health training within the past five years (then 24 hours every three years). On top of that comes five years of cumulative safety experience within the last ten on similar projects, or three years with a safety degree or an accredited certification such as CSP or CHST. The manual does not require a 40-hour EM 385 course or a BCSP credential; contract specifications may add them.
What is the three-phase control system?
Three-phase control system applies to each definable feature of work: (1) preparatory phase meeting before work begins, attended by SSHO, PM, superintendent, subcontractor foreman, QAR; (2) initial phase inspection when first work on the definable feature is performed; (3) follow-up phase recurring inspections during the activity. Each phase has documented meeting minutes or inspection report maintained in project file.
How often must contractors submit safety reports to USACE?
Cadence is set by the contract: daily inspection logs ride the daily QC report, weekly safety meetings are minuted, and most contracts require periodic (weekly or monthly) safety and exposure-hour reporting. Accidents and near misses go on ENG Form 3394 — notification to the KO/COR within 8 hours for fatalities, in-patient hospitalizations, amputations, eye loss or property damage over $600,000, within 24 hours for everything else, and the completed form within 7 days.
What does EM 385 compliance cost contractors?
APP authorship (standalone) quoted per scope. SSHO staffing project-duration hourly contract rates that vary by credential tier, location and duration. EM 385 40-hour training is priced per class, not per seat; AHA library development, EHS platform USACE configuration and pre-bid safety technical proposals are quoted per scope. Total cost depends on project scope and complexity.
Can my OSHA 30-trained safety pro serve as USACE SSHO?
Possibly. OSHA 30 is required but not sufficient: the 2024 manual also requires 24 hours of documented safety training within the past five years and five years of cumulative safety experience within the last ten (three with an accredited certification), and the Contracting Officer or COR must accept the ENG Form 6282 designation. If your contract’s Section 01 35 26 adds a 40-hour EM 385-1-1 course or a professional certification, those apply too.