Salazar Industries
Home » DoD Safety Staffing | Military Construction | Salazar Industries

DoD & Military Safety Staffing

BCSP-credentialed safety professionals for MILCON major construction, airfield projects, force-protection scope, SCIF construction, and base operations across Army, Navy, Air Force, and Marine Corps installations. EM 385-1-1 SSHO qualified with CAC and Secret-clearance eligibility through prime sponsorship.

50
U.S. STATES
OSHA 500
FOUNDER-LED VETTING
48hr
CANDIDATE PRESENTATION
EM 385
FEDERAL READY
Federal CandidatesBCSP CSP & CHSTEM 385-1-1 SSHONAVFAC / AFCEC ExperiencedCAC & Clearance EligibleSDVOSB Coordination

Ready to staff safety on your DoD project?

Federal candidates: EM 385 SSHO-qualified safety pros with documented DoD installation history — Army, Navy, Air Force, Marine Corps, joint bases. Many former military with DD-214 supporting clearance eligibility.

48-hour candidate proposal. CAC and base badging coordination handled in parallel with proposal to compress total time-to-mobilization on cleared scopes.

BCSP-Credentialed DoD & Military Safety Staffing

Salazar Industries places safety professionals onto Department of Defense installation and military construction (MILCON) projects in 48 hours or less. DoD work is its own discipline: USACE EM 385-1-1 Safety and Health Requirements Manual governs Army and Air Force construction; NAVFAC SOH-9510 and P-307 govern Navy and Marine Corps work; AFCEC standards apply to Air Force airfield scope; and Defense Contract Management Agency (DCMA) provides EHS oversight on defense industrial base contractors. Force-protection requirements, security clearance access, ITAR-controlled scope, and operational-mission continuity layer on top of OSHA baseline.

Every DoD candidate is screened for the BCSP credential your spec requires, OSHA 30 Construction or General Industry, and the EM 385-1-1 (2024) SSHO training and experience criteria, plus any 40-hour course the contract specifies. Clearance eligibility is verified per candidate and sponsorship runs through the prime contractor. Several hold prior SSHO designation experience on USACE-administered projects across multiple military installations.

Owner Patrick Salazar has been in safety since 2005 — NCCCO Mobile/Tower/Inspector/Lift Director, OSHA 500. DoD installation work concentrates EM 385-1-1 compliance, force-protection overlay, security clearance requirements, and operational-mission continuity all on one site. Every DoD candidate is vetted against the installation, prime contractor, and APP structure before any proposal.

Placement histories and references are documented per candidate in the proposal package.

DoD & Military Project Categories We Cover

Below are the DoD and military construction project types where dedicated safety coverage is most often the right call.

  • MILCON major construction — barracks, dining facilities, motor pools, training facilities, headquarters buildings, base infrastructure. Multi-year projects with USACE District administration.
  • Airfield and runway construction — runway repair and replacement, taxiway, apron, fuel hydrant system. AFCEC airfield-driving requirements, FOD prevention, airfield security overlay.
  • Hangar and maintenance facility construction — aircraft hangars, helicopter maintenance, vehicle maintenance, MRO facilities. Often involves fuel system, hydraulics, fall protection at hangar door height.
  • Magazine and ammunition storage construction — Quantity-Distance compliance, energetic materials handling adjacency, blast-resistant design.
  • Family housing and PPV (Public-Private Venture) housing — on-base family housing under privatization arrangements.
  • Operational facility renovation — occupied-facility renovation of barracks, dining, headquarters with mission continuity requirements.
  • Force protection construction — perimeter security upgrades, ECP (Entry Control Point) construction, ATFP (Anti-Terrorism Force Protection) compliance under UFC 4-010-01.
  • Cleared facility construction — Secret-level and TS-level cleared facilities; SCIF (Sensitive Compartmented Information Facility) construction with ICD-705 compliance.
  • Demolition and BRAC closure — Base Realignment and Closure demolition, hazardous material abatement, environmental restoration adjacency.
  • Utility infrastructure and energy projects — base electrical infrastructure, water and wastewater, thermal energy, central plant work.
  • Pier and waterfront construction — Navy pier construction, waterfront infrastructure, MARSEC compliance for waterfront access.
  • Range and training facility construction — small arms ranges, helicopter LZ, CALFEX ranges, MOUT training facilities.

DoD Customers, Primes & Project Structures

Below is the customer structure that drives demand on our DoD bench.

  • USACE Districts — Army Corps of Engineers Districts administer most Army and Air Force construction. Major districts: Louisville, Norfolk, Mobile, Sacramento, Honolulu, Tulsa, Galveston, Charleston.
  • NAVFAC Commands — Naval Facilities Engineering Command administers Navy and Marine Corps construction. NAVFAC Atlantic, Pacific, Marianas, EURAFCENT.
  • AFCEC — Air Force Civil Engineer Center administers Air Force-specific construction, especially airfield work.
  • DLA Construction Management — Defense Logistics Agency facility construction.
  • DCMA EHS oversight — Defense Contract Management Agency provides EHS audit and inspection of defense industrial base contractors performing on military bases.
  • Federal prime contractors — large national primes and base operations support contractors that hold DoD construction and services contracts.
  • SDVOSB and VOSB primes — Service-Disabled Veteran-Owned Small Business and Veteran-Owned Small Business primes commonly bid DoD work; we coordinate clearance and credential alignment.
  • 8(a) and HUBZone primes — federal small-business socioeconomic preference primes in DoD construction.
  • Large general contractors with federal divisions — national GCs with dedicated federal construction groups.
  • Specialty trade contractors — mechanical, electrical, fire protection, environmental abatement on DoD scope.
  • Base operations support contractors — facility maintenance contracts with safety oversight scope.
  • SCIF construction specialists — ICD-705 compliance, TEMPEST shielding, cleared-facility build specialists.

DoD Construction Hazards & EM 385 / NAVFAC / AFCEC Pressure Points

The hazard inventory below is what DoD-experienced candidates need fluency in. EM 385-1-1 is more prescriptive than OSHA 1926 baseline.

  • EM 385-1-1 Section 01 General Program — APP authorship, AHA by definable feature, three-phase control system (preparatory, initial, follow-up), monthly exposure reporting, ENG 3394 accident reports.
  • EM 385-1-1 Section 21 Fall Protection — USACE-specific anchor requirements above standard Subpart M, often more conservative than OSHA baseline.
  • EM 385-1-1 Section 25 Cranes and Hoisting — USACE-specific lift planning, critical lift designation, NCCCO operator and signal-person requirements.
  • EM 385-1-1 Section 28 Hazardous Waste Operations — federal HAZWOPER overlay for DoD environmental restoration scope.
  • Airfield safety overlay (AFCEC) — airfield driving permits, lighted equipment requirements, FOD programs, airfield security clearance, NOTAM filing for height obstructions.
  • Force protection (UFC 4-010-01) — Anti-Terrorism Force Protection during construction adjacent to operational facilities; standoff distance, vehicle barrier, blast-resistant design considerations.
  • Quantity-Distance (Q-D) compliance — for construction near magazines, ammunition storage, fuel storage. Distance requirements drive site logistics.
  • SCIF construction security — ICD-705 compliance, cleared worker requirements, TEMPEST shielding installation, security-cleared escort during construction.
  • Workforce clearance requirements — CAC issuance, base access vetting, foreign national restrictions, ITAR controlled-data access.
  • Operational facility complications — work adjacent to mission-critical operations, after-hours scheduling, exclusion zone management.
  • Munitions response and UXO awareness — for sites with prior live-fire or munitions storage history.
  • OPSEC (Operations Security) — controlled-information handling, photography restrictions, social media policy compliance.

DoD-Specific Standards & Federal Frameworks

DoD work runs against more standards than commercial federal construction. Below is the framework.

  • USACE EM 385-1-1 — Safety and Occupational Health Requirements; current edition 15 March 2024, with contracts solicited earlier remaining on the 2014 edition; baseline for Army and Air Force construction.
  • NAVFAC SOH-9510 and SOH-91 — Navy Occupational Safety and Health Program for facility construction.
  • NAVFAC P-307 — Management of Weight Handling Equipment; governs cranes on Navy installations.
  • AFI 91-203 — Air Force Consolidated Occupational Safety Instruction.
  • UFC 4-010-01 — DoD Minimum Anti-Terrorism Standards for Buildings (force protection construction standards).
  • UFC 3-260-01 — Airfield and Heliport Planning and Design.
  • ICD-705 — Intelligence Community Directive 705 governing SCIF construction.
  • DD-254 (Contract Security Classification) — defines classified information access for contract personnel.
  • DCMA EHS oversight — Defense Contract Management Agency safety oversight of defense industrial base contractors.
  • DoD 4145.26-M — Contractor Safety Manual for Ammunition and Explosives.
  • DoD 6055.09-M — Ammunition and Explosives Safety Standards (Quantity-Distance compliance).
  • OSHA 29 CFR 1926 and 1910 — federal baseline; EM 385-1-1 generally more conservative.
  • Service-specific safety bulletins — Engineering Change Proposal (ECP) safety reviews.
  • FAR Part 52.236-13 — Accident Prevention clause in federal construction contracts.

DoD Placement Process — Intake to Mobilization

DoD intake runs longer than commercial federal because of clearance verification, base badging, and APP-specific document review.

  • Step 1 — Discovery call (45-60 minutes). Installation and service (Army/Navy/AF/USMC/Joint), prime contractor structure, USACE District or NAVFAC command, project type (MILCON, airfield, SCIF, force protection, magazine, family housing), clearance requirements (CAC, Secret, TS), ITAR scope if applicable, anticipated duration, APP status (existing or authorship needed), expected concurrent trades.
  • Step 2 — Roster match (within 48 hours). Narrow to federal candidates with documented DoD experience. Service-specific (Army EM 385, Navy NAVFAC, AF AFCEC) matched to project. Clearance status verified for cleared scopes.
  • Step 3 — Proposal package. Resume with documented DoD project history, BCSP credentials, OSHA cards, EM 385 training dates, DD-214 for former military candidates, prior installation references with named former USACE QAR or prime construction managers, clearance level eligibility, straight-time bill rate.
  • Step 4 — Customer interview. Federal customer (USACE QAR, NAVFAC RO, AFCEC) often interviews with the prime project manager on the call. Cleared scopes add prime FSO interview.
  • Step 5 — Clearance verification and base badging. CAC application processing (timing varies by installation for first-time applicants), Secret clearance verification through prime sponsorship, base-specific badging, installation orientation, force-protection awareness training.
  • Step 6 — Day-one mobilization. Candidate arrives with full PPE, completes base-specific orientation, reviews APP and active AHAs, signs SSHO designation under USACE/NAVFAC, meets prime construction manager and federal QAR, walks the project with the customer rep.

Standard timing: 48-hour proposal, 14-30 day mobilization typical for cleared scopes (CAC processing is the bottleneck), 7-14 days for non-cleared CAC-only scopes.

Cost of DoD Military Safety Staffing — Rate Structure

Rates depend on the role and credential level your spec requires, the schedule (hours per week, shifts, overtime), the duration, the location (traveling professionals add per diem, lodging and mobilization), site-access requirements, and any deliverables such as written programs or reports. We quote every engagement in writing after a scoping call, and the quote states the hourly rate, any weekly minimum, how overtime is treated, per diem and mobilization terms, and the validity period. Insurance, payroll burden and credential verification are included in the rate.

Engagements are structured to fit the work: single-project coverage, multi-project or program coverage, contract-to-hire, and direct hire. Overtime is billed only if it is worked and only as stated in your quote.

DoD Safety Credentials & Clearance Eligibility

The credential roster we vet against per DoD placement.

  • BCSP credentials — CSP, CHST, ASP, OHST. DoD senior roles typically require CSP.
  • OSHA Outreach — 30-hour Construction baseline, 500 trainer endorsement, 510 General Industry trainer for occupied-facility crossover.
  • EM 385-1-1 training — the manual itself requires an OSHA 30-hour card plus 24 hours of documented safety and health training within the past five years (and every three years during the contract). A 40-hour EM 385-1-1 course is a contract-specific requirement (for example NAVFAC Pacific/Hawaii/Marianas and VA specifications), not a USACE credential.
  • NAVFAC SOH training — Navy-specific safety program training where required by command.
  • AFCEC airfield orientation — Air Force airfield driving and FOD programs.
  • OSHA Subpart M, P, L, R, AA, Z competent person designations — fall protection, excavation, scaffolds, steel erection, confined space, hazardous substances.
  • NCCCO Mobile Crane, Tower Crane, Inspector, Lift Director — for crane-heavy DoD scopes; Patrick himself holds Mobile, Tower, Inspector, Lift Director.
  • Force protection training — UFC 4-010-01 awareness, ATFP standards, ECP construction protocols.
  • DD-214 (former military) — documents prior service for clearance eligibility through prime sponsorship.
  • CAC eligibility — most DoD scope requires Common Access Card; we verify eligibility before placement.
  • Secret clearance eligibility — through prime contractor sponsorship; clearance eligibility is verified and documented per candidate.
  • TS clearance eligibility — through prime sponsorship for SCIF construction; ICD-705 awareness training.
  • HAZWOPER 40 — for environmental restoration scope on DoD installations.
  • UXO Awareness — for DERP, BRAC closure, and munitions response adjacency.
  • First Aid / CPR / AED — current AHA BLS, supplemented with Combat Lifesaver familiarity for certain installations.

Emergency Response, MILCON Surge & Installation-Specific Scenarios

DoD emergencies tend to follow three patterns.

  • Scenario 1 — USACE QAR safety stop-work. USACE Quality Assurance Representative issued safety stop-work order on prime contractor performance. We mobilize a senior EM 385 SSHO within 48 hours to support corrective action plan authoring, three-phase reset, and SSHO reassignment if applicable.
  • Scenario 2 — Force protection or security incident. Construction-related ATFP breach, OPSEC violation, unauthorized photography, or controlled-area access concern. Senior DoD-experienced safety pro mobilized within 24-48 hours for investigation and corrective action.
  • Scenario 3 — MILCON acceleration surge. Construction schedule compressed by mission requirement (deployment timing, fiscal year boundary, equipment delivery). We staff additional safety bandwidth during the acceleration window to maintain EM 385 compliance under increased work intensity.

Direct line: (252) 229-5238 — calls go to the owner, not a call center.

Pre-bench retainer for federal primes. If your firm runs 3+ concurrent DoD projects, we pre-bench EM 385-experienced safety pros against your forward schedule. CAC and clearance verification completed in advance to minimize mobilization timeline.

SDVOSB and VOSB coordination. Many DoD projects flow through Service-Disabled Veteran-Owned Small Business primes; our federal candidates include former military candidates with DD-214 documentation supporting SDVOSB prime sponsorship for clearance scope.

Installation closeout support. For BRAC closure projects, we provide safety coverage through demolition and environmental restoration phases. Several candidates have prior BRAC closure experience with regulatory restoration completion documentation.

Frequently Asked Questions About DoD & Military Safety Staffing

What DoD installations and services do you cover?
Army (Fort Liberty, Fort Bliss, Fort Hood, Fort Stewart, JBLM), Navy (NS Norfolk, NB San Diego, NS Mayport, NB Kitsap), Air Force (Eglin, Hill, Vandenberg, Travis), Marine Corps (Camp Lejeune, Camp Pendleton), Joint Bases (JB Andrews, JB Lewis-McChord, JB Charleston). Federal civilian and DoD-adjacent scope at NASA centers and DOE national labs available through related federal candidates.

Are your safety pros EM 385-1-1 qualified for SSHO designation?
Yes. Federal candidates are screened against the EM 385-1-1 (2024) SSHO criteria: OSHA 30, 24 hours of documented safety training within the past five years, and five years of cumulative safety experience within the last ten, plus any 40-hour course your contract specifies. Senior practitioners hold prior APP authorship experience and have served as named SSHO on completed MILCON projects.

Do you have safety pros with active Secret clearance eligibility?
Many federal candidates are former military with prior active Secret or TS clearance through their service. Clearance reactivation runs through prime contractor sponsorship under FAR 52.204-2 and the prime FSO. We verify clearance status, eligibility window, and prior agency sponsorship as part of the proposal package.

Can you handle SCIF construction with ICD-705 compliance?
Yes. TS-eligible candidates with prior SCIF construction experience are available through prime sponsorship. ICD-705 awareness training, cleared escort coordination, and TEMPEST shielding installation supervision included in scope. ICD-705 work typically runs 15-25% above standard DoD rates due to cleared-worker premium.

What does DoD military safety staffing cost?
Pricing depends on the credential level required, schedule, duration, location and travel, site-access requirements, and any document deliverables. Every engagement is quoted in writing after a scoping call; the quote states the hourly rate, weekly minimum (if any), overtime treatment, per diem and mobilization terms, and validity.

How long does CAC and base badging take?
First-time CAC timing varies by installation, so build it into the schedule. CAC reciprocity from prior DoD work is usually faster. Secret clearance verification through the prime FSO depends on agency adjudication backlog. We start badging paperwork at proposal acceptance to compress total time-to-mobilization to 14-30 days for cleared scope, 7-14 days for non-cleared CAC-only.

Ready to staff safety on your DoD project?

Most DoD placements proposed within 48 hours. Federal candidates with EM 385 SSHO designation experience, CAC and clearance eligibility through prime sponsorship, and ready for MILCON, airfield, force protection, or SCIF scope.

☏ Call (252) 229-5238 Free Quote
Scroll to Top
309 N William St, Goldsboro, NC 27530  |  (252) 229-5238  |